Quality Wins Project of the Year

Commissioning of the hydraulic system was completed before in- stalling the one-piece piston-head assembly. Wiring, then the installa- tion of the drum segments and platform followed. Ground-floor ring and first-floor landing equipment were then placed in position, with platform fit out waiting until the surrounds of the lift and entrance were complete. Décor finishes were coordinated and completed before final com- missioning of the entire lift system. A two-man team from Elevert erected and commissioned the lift. The client’s in-house team of tech- nicians and KONE staff provided assistance and support in moving the heavy items and subassemblies through the palace entrance. Maintenance Access to the first-floor landing is gained by first removing the gate- post assemblies, then lifting the floor pan. The inner workings of the lift can be accessed via the machine room. An interlocked door between the lift pit and machine room provides access to the hydraulic pistons, telescopic machinery, dampers and guide rails. Also, an interlocked floor trap in the platform floor allows access to a maintenance cell in the head of the central tower, where the car-door drives, guide shoes, terminal limits, floor switchgear and overrun buffers can be safely ac- cessed. Maintenance control with inching buttons to move the lift is provided within the maintenance cell. c

(l-r) Hydraulic tank and valve assembly, and controller

Specifications Travel: 5 m Stops: Two; open front at ground floor; open rear at first floor Speed: 0.4 mps External diameter: 2,100 mm Capacity: 1000 kg Drive: Three direct-acting hydraulic cylinders Control: Fully automatic microprocessor Doors: Electric, fully automatic Doors: Two-panel, center-opening glass Landing: Power-operated, center-opening, swinging glass gates Credits Owner: Wael Al Sawi, project manager, Ministry of Presidential Palace Affairs (Abu Dhabi) Consultant: Amanj Fatah, project manager, Morganti (Abu Dhabi) Main contractor: Tony D’Costa, KONE Middle East (Abu Dhabi) Designer, manufacturer and installer: Elevert Co. Ltd. (Bangkok)

Control system: STEP (Shanghai) Hydraulics: Bucher (Switzerland) Maintenance: Elevert/KONE Middle East

Central support tower, installed

January 2013 | ELEVATOR WORLD | 71

Made with